Nathan Morgan
111
N. Main #112
Vidor,
TX 77662
Phone:
409-782-8247 Main Cell
Or
832-675-6819 Leave Message
Morgan708010@yahoo.com
******************************************************************
Status:
Becoming Available
******************************************************************
Qualifications:
·
Project management skills, couple with outstanding human
relations.
·
Excellent communication skills, leadership skills and
initiative.
·
Demonstrated ability to adapt and implement technological
changes.
·
Proven problem solving abilities, including root case
analysis of operational problems.
·
Proficient in Primavera P3.1, P5, P6, P6.7, P6.8.1.
P6.R8.3.5 Enterprise
·
Excellent knowledge of industry standards, specifications,
and regulations.
·
The ability to understand engineering document, codes and
brands
·
Project control, planning/scheduling, estimating, budgets,
proposals, cost/material control, problem solving, and quality control.
·
Promotes team work; coaches and guides others
·
Estimating Labor, Material, Equipment and Indirect Cost
Related Experience:
ROWLAND
GROUP
Sr.
COMPLETIONS PLANNER/SCHEDULER
VOEST
ALPINE PROJECT- CORPUS CHRISTI, TEXAS
9/2015-PRESENT
·
Planned and Scheduled the Completion and Demobilization of
the Heat Recovery, the Reformer, the Furnace and the Vapor Recovery Areas
·
Updated and Progressed Multiple Schedules
·
Worked with Management to Maintain the Proper Level of
Equipment Needed for the Jobsite
·
Assisted the Project Subject Matter Expert in Getting
Project Density Levels, Craft Stacking and Equipment and Work Front
Congestion Levels on the Jobsite
·
Created Change Orders and Schedule Fragnets to Show the
Effects of the Change Order to the Schedule
·
Tracked and Coordinated the Refractory Sub Contractor to
Ensure Work was done in a Timely Manner
·
Maintained an XER Project File of Previous Data Dates of the
Integrated Schedule
·
Field Verified all Work Being done and Progressed in the
Schedule
·
Used the Erection Manuals and P&ID’s to Double Check
that all Work was in the Schedule to be Done
LINK
OIL SERVICES
Sr.
PLANNER/SCHEDULER
WIC-OPS-ASSET
DEVELOPMENT-ABANDONMENT
CHEVRON
UPSTREAM – LAFAYETTE, LA
9/2013-9/2015
·
Helped to Develop and Implement the Primavera Schedule for
Use GOM Wide Using Primavera 8.3 Enterprise
·
Worked With Other Schedulers to Create an Integrated
GOM Wide Multifunction Schedule
·
Developed EPS and WBS level Coding along with User Defined
Codes
·
Developed Filters and Layouts to Provide Each Manager with
the Layouts they needed
·
Logically tied All Activities in Schedule to Provide
Management and Team with the Most Accurate Schedule Possible
·
Interacted with Team and Management to Update Schedule on
a Daily, Weekly and Monthly Basis.
·
Worked with Different Functional Groups Throughout Chevron
to Provide a Fully Integrated GOM Wide Schedule
·
Worked with The LOWIS Database, Wellview Database, and OWL
Database, Excel, Word, PowerPoint
·
Collaborated with Geologist, Petroleum Engineers, WIC
Engineers and OPS Engineers to Build and Update the P6 Schedule
·
Merged Numerous Shadow Schedules within GOM (MS PROJECTS
and EXCEL) to One Integrated Schedule (Primavera 8.3) using Citrix
·
Coordinated With Marine Logistics to Ensure Proper
Resources Would be Available
WILBROS
CONSTRUCTION
TURNAROUND SERVICES
FCCU
T/A PLANNER/SCHEDULER
CONOCO
PHILLIPS & CENEX REFINERY- BILLINGS & LAUREL, MT
2/2012-6/2013
· Modify and
add activities
· Develop and
Apply Activity and Project codes to all activities in schedule
· Front end
load all resources and hours
· Create
layouts and filters as needed for Client and Project Management
· Logically
tie all activities to complete the outage within the outage time frame
· Developed
progress tracking sheet for the different equipment and crafts
· Created and
issued Pre T/A, T/A and Post T/A Look- Ahead’s for the Project Management and
Client
· Developed
SCA and Tracked all changes to the Pre T/A and T/A scope prior to Baseline of
Schedule
· Actively
participated in all FCC meetings with subs and client
· Produced
Manpower Curves and Demobilization Plans for Project Management and Client
TYCO
THERMAL CONTROLS
TRACER
INDUSTRIES- UNIT LEAD PLANNER/SCHEDULER
MOTIVA-
PORT ARTHUR, TX
4/2011-1/2012
·
Created and progressed schedules for 3 separate contracts
for OSBL areas using P6.0.
·
Worked with Project Superintendents and Project Controls
to get activity % completes.
·
Created code library for each schedule
·
Created Microsoft Excel Progress Tracking sheet for the
Turner Contract in order to monitor the daily progress of the IBC and Utility
areas.
·
Issued weekly and 3 week look ahead schedules for each
contract.
·
Issued weekly Resource Curves and monthly Release Curves
for each contract using Microsoft Excel and P6.0.
·
Assisted Project Controls in developing and maintaining
weekly and monthly reports for all contracts.
·
Worked with the project team in developing and maintaining
3 part curves for all contracts.
·
Assisted other project schedulers to develop and progress
their schedules when needed.
·
Collaborated with Electrical and Insulator Superintendents
to develop and send out Activity Step Outs for additional work being performed.
·
Actively participated in weekly contractor progress
meetings to narrow down turnover dates of piping to be heat traced and gather
new or revised completion dates from Motiva.
PETROPLAN
– MAINTENANCE AND NEW CONSTRUCTION PLANNER/SCHEDULER
BP
PASCAGOULA GAS PLANT – MOSS POINT, MS
11/2010-4/2011
·
Assisted other BP maintenance planners to create the
maintenance schedule using MAXIMO.
·
Created work orders and work packages for the Maintenance
Mechanics, I&E Techs and Operations departments using Maximo.
·
Created CAL Sheets for PM’s being performed on plant
instrumentation.
·
Updated inventory list and inspection sheets as needed to
maintain accuracy.
·
Assisted BP planners in purchasing and receiving
materials.
·
Worked on creating an up to date and accurate 8Q schedule
·
Created on site schedule for operations and I&E
contractors for moving control room to safe blast radius.
·
Used Excel, Word, P6, Microsoft Project to create and
assist other team members when needed.
ELKHORN
CONSTRUCTION INC.- CONSULTANT
DUKE
CONOCO PHILLIPS-MIDSTREAM PLATTEVILLE COLORADO
8/2010-9/2010
·
Assisted Project Team on Updating Schedule Using Microsoft
Projects
·
Reviewed Task Percentages with Superintendents and All
other Supervisors
·
Helped to Put Together Equipment Packages for Quality
Control Manager
·
Assisted Superintendent with Putting Together Weld
Tracking Log
·
Worked with Project Scheduler to Review the Logic Tie’s
within Equipment Packages and Updating Activity Predecessors and Successors.
·
Worked with Project Manager on Correcting Inaccurate Start
and Finish Dates Within the Schedule to More Accurately show the Work Being
Performed.
ITC
–SCHEDULER-P6 TRAINER
VALERO
SOUTH NEW JERSEY
7/2010-8/2010
·
Creating a New Project
·
Assigning Codes
·
Importing and Exporting Data ( Transferring Files From P3
And Excel to P6 )
·
Navigating P6 vs P3
·
Reporting in P6 vs P3 and the use of Excel
·
Baselines vs Target Setting
·
Use of Online Resources
TETON
CONSTRUCTION- Construction Planner
DCP
SULFUR BLOCK EXPANSION
11/2009-05/2010
·
Planned and
Schedule the activity procedures for inspection and repair of Compressor and
Steam Turbine rotors.
·
Develop
preventive and corrective maintenance plans and actions for rotating
equipment.
·
Work with
Primavera Project planner P6.2 for planning and scheduling.
·
Responsible
for interacting with Vendors to get all material.
·
Maintained
daily and monthly reports for Project manager.
·
Plan and
Schedule projects along with Subcontractor
·
Integrate P6
schedules from engineering and subcontractors
·
Control
budgets, changes and estimates at completion of turnaround.
·
Field
verified all jobs to ensure jobs can be done in a proficient manner.
·
Work with
Engineering on plans for Compressors / Steam Turbine and Gas Turbine
Internals.
·
Develop Client and Contractor Provided Equipment Delivery
Schedule.
·
Assist in Package Development, Verify Work Scope &
Constraints
JACOBS
ENGINGEERING- TEXAS CITY- Project Construction Planner/Scheduler
FGR
EXPANSION PROJECT- BP TEAS CITY
05/2008-09/2009
·
Developed EPC
Schedule for FGR Expansion Project including the (WBS) the Activity Codes and
Project Codes working with Primavera version 6.1
·
I worked with
the Project team including the Project Coordinator and the Project Manager to
get Activity Breakdowns and Durations for the activities.
·
We were
successful in passing two review boards with a 300 million dollar project
schedule that we put together in less than 3 months total.
·
I Built and
executed a schedule that included 6500 activities with approximately 13500
relationships.
·
Started
working on AU2 and HRU Turnaround Projects using Primavera 3.1.
·
Developed
Coding for HRU project and the AU2 Turnaround. Detailed out and updated the
AU2 project with the help of the Coordinator and Superintendents.
ALPC
– FREEPORT, TX- Turnaround Lead Planner
AIR
LIQUIDE ASU EXPANSION PROJECT
01/2007-05/2008
·
Responsible
for Budget and Scope development
·
Responsible
for planning maintenance activities.
·
Responsible
for all materials and equipment needs.
·
Scheduled
Turnarounds using P3/P6.2.
·
Create orders
in SAP to track Labor and Materials.
·
Administrator
for Planning Group Network Drives.
·
Responsible
for overall Turnaround, Coordination of meetings, scope development, Planning
effort, Contractor selection, Execution and closeout
·
Scope
development, estimate man-hours, materials, rental equipment needs and tools
for various size turnarounds ranging from 20,000 to 250,000 man-hours
·
Assisted
Client in migrating from P3 to P6.2.
MATRIX
SERVICE INC, TEXAS CITY, TX- Project Controls Specialist
PIPESTILL
3B TURNAROUND/CAPITAL EXPANSION PROJECT
05/2006
– 01/2007
·
Supported
Project Controls – Cost/Change Control Management efforts as part of $300
Million Turnaround/Capital Expansion project for the Pipe still 3B Refinery,
Texas City, TX.
·
Assist in the
planning, building, and maintaining of project schedule
·
Assist cost
with quantities and man-hour data from P-6 for weekly and monthly reporting
·
Explains
difficult issues and works to establish consensus
·
Acts as a
resource for colleagues with less experience.
·
Work with
Primavera Project planner P-5, P-6 for planning and scheduling.
·
Coordinate
labor, material, equipment, engineering and subcontractors to maximize
schedule efficiency
·
Maintained
daily and monthly reports for Project manager
·
Responsible
for multi projects.
·
Work with
other Planners on assisting in the work plan, estimate and documentation of
the work.
·
Budgeting and
forecasting, generating monthly reports and presenting this to Client in MS
Power Point.
·
Developed
best practice guideline for PM processes.
·
Review
blueprints and specification to accurately determine materials needed.
·
Maintaining
CTR’s and WBS in conjunction with Home Office and Contractor.
·
Applies
knowledge and skills to a wide range of standard and nonstandard situations.
·
Interprets
customer needs, assesses requirements and identifies solutions to
non-standard requests.
CHICAGO
BRIDGE AND IRON CONSTRUCTION, BECON CONSTRUCTION, SERV-TECH, ECHO
CONSTRUCTION,
ACROSS
THE U.S
PIPING
SUPERVISOR, BOILERMAKER SUPERVISOR, SAFETY SUPERVISOR, FIELD PLANNER
PIPEFITTER,
BOILERMAKER, RIGGER,
1994-2009
Supported project teams at various sites to
identify and sequence manageable work elements; determine which crafts are
required to perform the work; determine man-hours through the application of
engineered work standards; assign priorities; and prepare work order
documents
Helped to supervise schedule development,
maintain, monitor, and develop recovery plans when needed. As Safety
supervisor I was responsible for all orientation, training, drug testing, and
safety audits for the company and with the clients, keeping all records per
OSHA, state, and federal requirements, managing all incidents and accidents,
maintaining safety supplies.
Safety Training Courses:
CPR-First
Aid
OSHA
10 Hour Construction
CBI 8 Hour Basic Rigging Course,
CBI Basic Rigging Instructor Course
CBI 8 Hour Basic Mobile Crane Course
CBI Mobile Crane Instructor Course
National Safety Council First Aid, CPR,
CBI Accident Prevention 1 Training
NSCs Supervisors Development Program
Incident and Injury Free Orientation
-JMJ Enterprises
Incident and Injury Free - Train the
Trainer Course- JMJ Enterprises
High Angle Confined Space Rescue
Training-
Confined Space and Rescue Training- 8
hr. course
Scaffold competent person
Electrical competent person
Respiratory Protection Program Training
C- Stop Training
S.T.A.R.T Matrix Supervisor Training
T.W.I.C
Expires
10-11-2014
Military
Army
Reservist 1987-1995
Education/Training
Lamar
University, Beaumont, Texas
Advanced
Training Course for Primavera 6.0
Knowledge and use of Productivity tools:
Proficient
in MS Office Applications MS Excel, MS PowerPoint, MS Access, MS Word
MS
Project Planner
Proficient
in Primavera Project Planner 3.1
Primavera
v 5.0, P.6.0, P6.2, P6.7